St Martins Le Grande (Level 8 & 9) - Occupied Building

Client:
Mitsui

Main Contractor:
Takenaka

Project Management:
Takenaka

Consultant:
Lund Roberts Design and Build Project

Value:
£575, 000

Scope of work

  1. Validation and testing of the existing electrical installation including, PA system,  Fire Alarm, Lighting Control System
  2. Preparation of the electrical design
  3. Small power installation throughout both floors
  4. Lighting control system modifications throughout both floors and installation of new LED office lighting throughout
  5. Fire alarm and PA enhancements to suit the revised space plan
  6. Installation of a UPS system within a new comms room
  7. Installation of cable basket and trunking containment at high level for IT and security cabling.